About the UT Intramural Field
This 38-acre project was constructed where the former UT Golf Range and Married Student Housing Apartments once stood. After the apartments were demolished, over 200,000 cubic yards of soil were moved to provide areas for the intended sports fields, volleyball courts, walking trails, a central complex, and a maintenance facility.
The site consists of four natural-turf multi-purpose fields and four artificial-turf multi-purpose fields. There are two dedicated softball fields with dugouts and three NCAA-regulation sand volleyball courts. Over 20 mature existing trees were protected and incorporated into the landscaping. The site is engineered to collect 100% of rainfall to be used for irrigation. Several retaining walls were constructed using unique faux stone concrete block. Over one mile of walking trail was incorporated into the design, allowing access via the City of Knoxville’s Greenway Trail system.
Coordination of the work on this project, a showpiece for campus recreational sports, highlights our ability to work with numerous trades to complete a project. Logistical coordination was critical in order to maintain the project schedule without painting ourselves into a corner. We were able to complete the major work within the footprint of the fields, courts, and buildings by chasing each trade out through the bottlenecked entrance into the site from the parking lot.
Project Details
Official Title
Location
Client
Designer
Cost
$10.35 Million
Market
Completion Date
Project Team
Project Details
Location
1512 Cumberland Avenue
Cost
000,000,000.00
Market
Place
Certification
Cert.
Size
000,000
Completion Date
Time
Text
Client
Company
Architect
Person